Project Description :
In this project, the bathroom and toilet were separated by a wall in the middle, with each having its own separate door. The middle wall was removed, and one of the doors, which belonged to the bathroom, was eliminated. The previous bathtub was replaced with a shower tray, the toilet location was changed, and plumbing was completed for all sections. All walls and the ceiling were plastered and then tiled. You can see the entire process in the photos.
Location : | East Twickenham | Project Price at Time of Execution (excluding materials): | £6200 | Project Duration: | 5 Weeks |