Clissold bathroom renovation and plumbing
This project covers a complete bathroom renovation in Clissold, including installing hot- and cold-water plumbing and replacing the toilet waste-pipe outlet. The completed work is documented in the gallery above.
The project required the bathroom to be refurbished as a whole rather than replacing just one item. As with any full renovation, the precise installation plan must consider existing pipe routes, room dimensions, conditions uncovered during removal and the selected fixtures.
Recorded project details
Location: Clissold, London. Duration: 24 working days. Historical labour cost: £7,400 excluding materials. These figures apply to the completed project and cannot be used as a quotation for a different bathroom.
For more on our approach, see bathroom renovation services, or ask for a project assessment.
Location : Clissold Project Price at Time of Execution (excluding materials): £7400 Project Duration: 24 Work day